Start practice

Post goods issue

Sales and receivables (SD) ·

Post goods issue (PGI) is the moment goods leave the warehouse for a customer. The warehouse creates an outbound delivery from the sales order, picks and packs the goods, then posts goods issue. Stock goes down, the cost of goods sold is posted, and the delivery becomes ready for billing.

How it works

In the system
VL01N   Create Outbound Delivery
VL02N   Change Outbound Delivery (pick, then Post Goods Issue)
VL03N   Display Outbound Delivery
VL06O   Outbound Delivery Monitor
VL09    Cancel Goods Issue

The steps:

StepWhat happensWhere
1. Create deliveryThe delivery copies items from the sales orderVL01N
2. PickWarehouse picks the quantity, entered as picked quantityVL02N or warehouse management
3. PackOptional: items packed into handling unitsVL02N
4. Post goods issueStock decreases, cost of goods sold postedVL02N, button Post Goods Issue

Goods issue for a delivery uses movement type 601.

Journal entry
Debit   500000 Cost of goods sold         $3,920.00
Credit  145000 Finished goods inventory   $3,920.00

The amount is the stock value of what shipped (quantity × standard or moving average cost), not the selling price. Revenue comes later with billing.

Examples

A full shipment

FieldValue
Sales order16452
Delivery80312764
ItemFG-4150 Wire harness assembly
Delivery quantity80 EA
Picked80 EA
Standard cost$49.00 per EA

Question: What does PGI post? Answer: 80 × $49.00 = $3,920.00, debit cost of goods sold, credit finished goods inventory.

Question: Can billing start before PGI? Answer: For deliveries, no. Delivery related billing waits for goods issue, because the invoice must match what actually shipped. See vf01 create billing document.

Partial picking

The order is for 80 EA but only 60 are on the shelf. The picker enters 60. When the warehouse posts goods issue, the delivery quantity adjusts to 60, and the remaining 20 stay open on the sales order for a later delivery.

Reversing a goods issue

Goods were issued in the system, but the truck never left. Use VL09 to cancel the goods issue (movement type 602). Stock comes back and cost of goods sold is reversed. Then correct the delivery or ship it later.

Variants

Delivery due list. Instead of creating deliveries one by one, the warehouse runs VL10 to create deliveries for all orders due to ship.

Warehouse management. In larger sites, picking runs through warehouse tasks; confirming them fills the picked quantity in the delivery.

Proof of delivery. Some customers confirm receipt electronically, and billing waits for that confirmation.

Movement types. 601 is goods issue for a delivery, 602 its reversal, 651 a customer return. The full list is in sap movement types.

The sales order that starts the chain is created in va01 create sales order.

Timing and revenue. For most products, the goods issue date is also when the customer takes ownership under the agreed shipping terms. Finance cares that goods issue and billing fall in the same period, so cost and revenue are reported together.

The delivery note. The printed delivery note travels with the goods and carries the delivery number. When a customer says a shipment is short, the delivery number connects their complaint to your picking and goods issue records.

Batches and serial numbers. For products managed in batches or with serial numbers, the warehouse records which batch or serial number left. That is how a company traces a faulty batch to every customer who received it.

Common errors

Picked quantity is missing

PGI refuses when picking is required but the picked quantity is empty. Enter the picked quantity, or confirm the warehouse tasks.

Deficit of stock

There is not enough unrestricted stock on the posting date. Check MMBE: stock may be in quality inspection, or a goods receipt from production is not posted yet.

Posting period closed

The goods issue date is in a closed materials or finance period. Use today’s date, or ask finance.

Goods issue posted too early

Posting PGI before the truck leaves makes stock and cost look as if goods shipped. If shipping is delayed, cancel with VL09 rather than leaving it.

Practice

The delivery level gives you orders, stock and warehouse notes and asks what to do: create the delivery, pick, post goods issue or wait. You work out the cost of goods sold yourself and decide when a reversal with VL09 is needed.

Practice: Delivery and goods issue

Free, in your browser, no sign up. Opens the level “Delivery and goods issue”.

FAQ

What does post goods issue mean in SAP?

Posting the moment goods leave the warehouse for a customer. Stock decreases and the cost of goods sold is recorded.

Which movement type is used for post goods issue?

601 for goods issue against an outbound delivery. Its reversal is 602.

How do I reverse a post goods issue?

With VL09, Cancel Goods Issue, for the delivery. It posts movement type 602 and brings the stock back.

Why is cost of goods sold posted at goods issue and not at billing?

Because the cost arises when stock leaves. Revenue follows with the billing document, and both normally fall in the same period.

What is the outbound delivery monitor?

VL06O, a list of deliveries by status: to be picked, to be posted for goods issue, or already issued. Warehouse leads use it to plan the day.

Does post goods issue create an accounting document?

Yes, for valued stock. Cost of goods sold is debited and finished goods inventory credited. You can open it from the delivery’s document flow.

For learning only. Nothing here is legal, financial, tax or investment advice. Tolerances, policies and rates in the examples belong to a made up company; your employer’s settings decide what applies at work.